loading...
Job Scheduling for Prime Time vs. Non-Prime Time
Chicago, Illinois September 23-September 26
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/CLUSTR.2002.1137789Fourth IEEE International Conference ...
 This Article 
 
PDF
HTML
 
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
Virginia Lo, University of Oregon
Jens Mache, Lewis and Clark College

Current job scheduling systems for massively parallel machines and Beowulf-class compute clusters support batch scheduling involving two classes of queues: prime time vs. non-prime time. Jobs running in these queue classes must satisfy different criteria with respect to job-size, runtime, or other resource needs. These constraints are designed to delay big jobs to non-prime time in order to provide better quality service during the prime time work-day hours.

This paper surveys existing prime time/non-prime time scheduling policies and investigates the sensitivity of scheduling performance to changes in the jobsize and run-time limits allowed during prime time vs. non-prime time. Our simulation study, using real workload traces from the NASA NAS IBM SP/2 cluster, gives strong evidence for the use of specific prime time limits and sheds light on the per-formance trade-offs regarding response times, utilization, short term scheduling algorithm (FCFS vs. EASY backfilling), and success and overflow rates.

Citation:
Virginia Lo, Jens Mache, "Job Scheduling for Prime Time vs. Non-Prime Time," cluster, pp.488, Fourth IEEE International Conference on Cluster Computing (CLUSTER'02), 2002
Usage of this product signifies your acceptance of the Terms of Use.