loading...
Solving the Flow Shop Problem by Parallel Tabu Search
Warsaw, Poland September 22-September 25
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/PCEE.2002.1115237International Conference on Parallel ...
 This Article 
 
PDF
HTML
 
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
Wojciech Bożejko, Wroclaw University of Technology
Mieczysław Wodecki, University of Wrocław
In this paper we present a parallel tabu search algorithm for the permutation flow shop sequencing problem with the objective of minimizing the flowtime. We propose a neighbourhood using so-called blocks of jobs on a critical path and a backtrace jump method. By computer simulations it is shown that the performance of the proposed algorithm is comparable with the random heuristic technique discussed in literature. Another interesting property is the fact that the speedup of parallel implementation is equal or even greater than p, where p is the number of processors.
Citation:
Wojciech Bożejko, Mieczysław Wodecki, "Solving the Flow Shop Problem by Parallel Tabu Search," parelec, pp.189, International Conference on Parallel Computing in Electrical Engineering (PARELEC'02), 2002
Usage of this product signifies your acceptance of the Terms of Use.