loading...
Requirement and Design Trade-offs in Hackystat: An In-Process Software Engineering Measurement and Analysis System
Madrid, Spain September 20-September 21
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/ESEM.2007.36First International Symposium on Empi ...
 This Article 
 
PDF
HTML
 
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
Philip M. Johnson, University of Hawai'i, USA
For five years, the Hackystat Project has incrementally developed and evaluated a generic framework for in-process software engineering measurement and analysis (ISEMA). At least five other independent ISEMA system development projects have been initiated during this time, indicating growing interest and investment in this approach by the software engineering community. This paper presents 12 important requirement and design tradeoffs made in the Hackystat system, some of their implications for organizations wishing to introduce ISEMA, and six directions for future research and development. The three goals of this paper are to: (1) help potential users of ISEMA systems to better evaluate the relative strengths and weaknesses of current and future systems, (2) help potential developers of ISEMA systems to better understand some of the important requirement and design trade-offs that they must make, and (3) help accelerate progress in ISEMA by identifying promising directions for future research and development.
Citation:
Philip M. Johnson, "Requirement and Design Trade-offs in Hackystat: An In-Process Software Engineering Measurement and Analysis System," esem, pp.81-90, First International Symposium on Empirical Software Engineering and Measurement (ESEM 2007), 2007
Usage of this product signifies your acceptance of the Terms of Use.


Suggestions