loading...
Wasp Algorithm for Dynamic Scheduling Based on Manufacturing Grid
May 23-May 25
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/ISIP.2008.1002008 International Symposiums on Info ...
 This Article 
 
PDF
HTML
 
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
To resolve dynamic job scheduling problem efficiently in manufacturing grid, a manufacturing grid system based on two-layer structure is proposed. This paper applies the theory of wasp colony’s interaction with environment to dynamic job shop scheduling and constructs a wasp-based scheduling decision mechanism. This paper also analyzes urgent events and rescheduling methods to deal with them respectively. At the end, the scheduling algorithm is developed and an instance is given to confirm the above mechanism.
Citation:
Bao Zhen-qiang, Li Xiang-Qing, Zhang Dan, Wang Peng, Gao Kai-zhou, "Wasp Algorithm for Dynamic Scheduling Based on Manufacturing Grid," isip, pp.83-87, 2008 International Symposiums on Information Processing, 2008
Usage of this product signifies your acceptance of the Terms of Use.