loading...
An NoC Test Strategy Based on Flooding with Power, Test Time and Coverage Considerations
Hyderabad, India January 04-January 08
DOI Bookmark: http://doi.ieeecomputersociety.org/10.1109/VLSI.2008.11121st International Conference on VLSI ...
 This Article 
 
PDF
HTML
 
 Share 
   
 Bibliographic References 
   
 Add to: 
 
Digg
Furl
Spurl
Blink
Simpy
Google
Del.icio.us
Y!MyWeb
 
 Search 
   
A test strategy for testing NoC switches based on flooding is presented in this paper. This test strategy tests all switch ports and network routes, while it avoids sending a test packet arriving at a switch in every direc- tion. This test strategy is referred to as pseudo- exhaustive, versus the exhaustive testing that sends an incoming test packet of a switch in every direction. As compared with the exhaustive strategy, the pseudo- exhaustive testing consumes lower power consumption, has a lower test time and still has 100% switch port fault coverage. This paper discusses our test strategy, test mode switch hardware requirements, and evaluates test power, time, and coverage.
Citation:
Mahshid Sedghi, Elnaz Koopahi, Armin Alaghi, Mahmood Fathy, Zainalabedin Navabi, "An NoC Test Strategy Based on Flooding with Power, Test Time and Coverage Considerations," vlsid, pp.409-414, 21st International Conference on VLSI Design (VLSI Design 2008), 2008
Usage of this product signifies your acceptance of the Terms of Use.